This is the final station of MPS which is connected to all other MPS stations through Ethernet connection with a separate direct communication with Industrial SCARA Robot.

MPS CCU is equipped with SCADA through which participants can control individual stations as well as entire MPS system in integration mode. Participants can select between Remote mode and station mode through which systems can be operated remotely.

CCU is industry 4.0 ready.

3D simulation and designing software is displayed on the second screen of CCU.  Entire MPS operation can be dynamically simulated on this software through OPC UA connectivity.

List of softwares installed in CCU:

  1. SCADA (Siemens WinCC Professional with minimum 4096 tags with developer license)
  2. Visual components 3D with OPC UA connectivity
  3. Mitsubishi RT Tool box with dynamic 3D simulation
  4. TIA Basic for ladder design and updation of individual station’s PLC